Brosque, C, Skeie, G and Fischer, M (2021) Comparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers. Journal of Construction Engineering and Management, 147(03).

BuHamdan, S, Duncheva, T and Alwisy, A (2021) Developing a BIM and Simulation-Based Hazard Assessment and Visualization Framework for CLT Construction Design. Journal of Construction Engineering and Management, 147(03).

Cherkos, F D and Jha, K N (2021) Drivers of Road Sector Public-Private Partnership Adoption in New and Inexperienced Markets. Journal of Construction Engineering and Management, 147(03).

Dias Barkokebas, R and Li, X (2021) Use of Virtual Reality to Assess the Ergonomic Risk of Industrialized Construction Tasks. Journal of Construction Engineering and Management, 147(03).

El Sayed, A Y, Darwish, M and Nassar, K (2021) Design and Constructability of Novel Extendable Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 147(03).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001989
  • Abstract:
    Formwork is a very important component in the construction industry and can have major impacts on a project’s budget. The process of selecting a suitable formwork system becomes very important in avoiding budget overruns due to choosing an unsuitable system for a project. Despite this importance, the developments for the formwork system are limited to adding accessories to the already existing systems. This was the case until the development of the funicular arch steel truss (FAST) falsework system, which introduced the concept of the funicular arch in developing a new formwork system. The FAST system had some drawbacks that were targeted during the development of the extendable arched steel truss (EAST) falsework system. The EAST system is proven to be more structurally sound than the FAST system and any of the currently commercially available formwork systems in terms of load capacity and satisfying the deflection criteria (span/360). The EAST system also provides higher lateral stability to the formwork system. To understand the advantages of the new EAST system, three case studies were carried out to compare the FAST system, EAST system, and commercially available system, known as the MULTIFLEX girder slab formwork. The results were compared in terms of weight, cost, and erection time. The results proved that the EAST system has a lower erection time than the FAST and the MULTIFLEX girder slab formwork, while it has a higher weight and consequently higher cost than the other two systems; however, it has higher structural soundness and safety factors.

Hamledari, H, Sajedi, S, McCabe, B and Fischer, M (2021) Automation of Inspection Mission Planning Using 4D BIMs and in Support of Unmanned Aerial Vehicle–Based Data Collection. Journal of Construction Engineering and Management, 147(03).

Kar, S and Jha, K N (2021) Investigation into Lead Time of Construction Materials and Influencing Factors. Journal of Construction Engineering and Management, 147(03).

Katsuragawa, C M, Lucko, G, Isaac, S and Su, Y (2021) Fuzzy Linear and Repetitive Scheduling for Construction Projects. Journal of Construction Engineering and Management, 147(03).

Kim, K and Cho, Y K (2021) Automatic Recognition of Workers’ Motions in Highway Construction by Using Motion Sensors and Long Short-Term Memory Networks. Journal of Construction Engineering and Management, 147(03).

Liu, Y, Jarvamardi, A, Zhang, Y, Liu, M, Hsiang, S M, Yang, S, Yu, X and Jiang, Z (2021) Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. Journal of Construction Engineering and Management, 147(03).

Ma, G, Jia, J, Ding, J, Wu, M and Wang, D (2021) Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China. Journal of Construction Engineering and Management, 147(03).

Mahdavian, A, Shojaei, A, Salem, M, Yuan, J S and Oloufa, A A (2021) Data-Driven Predictive Modeling of Highway Construction Cost Items. Journal of Construction Engineering and Management, 147(03).

O’Connor, J T, Shrestha, B K, Winkler, M and Ouk Choi, J (2021) Relationship between Commissioning and Start-Up Success Factors Achievement and Performance in Capital Projects. Journal of Construction Engineering and Management, 147(03).

Raymond, A J, Kendall, A, DeJong, J T, Kavazanjian, E, Woolley, M A and Martin, K K (2021) Life Cycle Sustainability Assessment of Fugitive Dust Control Methods. Journal of Construction Engineering and Management, 147(03).

Shirowzhan, S, Sepasgozar, S M E and Trinder, J (2021) Developing Metrics for Quantifying Buildings’ 3D Compactness and Visualizing Point Cloud Data on a Web-Based App and Dashboard. Journal of Construction Engineering and Management, 147(03).

Yoon, S, Weidner, T and Hastak, M (2021) Total-Package-Prioritization Mitigation Strategy for Deferred Maintenance of a Campus-Sized Institution. Journal of Construction Engineering and Management, 147(03).

Zhang, S, Jiang, P, Zhang, Z and Wang, C (2021) WebGIS-Based Collaborative Construction Quality Control of RCC Gravity Dam Using Sensing Devices. Journal of Construction Engineering and Management, 147(03).

Zuniga-Garcia, N, Machemehl, R B, Khwaja, N A, Pruner, K D and Fu, M (2021) Estimation of Road User Costs for Work Zones in Data-Limited or Time-Constrained Environments. Journal of Construction Engineering and Management, 147(03).